Project Description
Hazelett Machine
Corporation
Colchester, VT
Pre-engineered steel manufacturing addition, 35,000sf with bridge crane connecting to existing crane way.
Delivery Method: Negotiated Design-Build
Completed: June 2001
Owner: Hazelette Machine Corp.
Design: E.F. Wall Design-Build
Unique Attributes: E. F. Wall worked with client personnel in maximizing value for the project during the pre-construction phase. To minimize impacts to ongoing operations, the construction phase was expedited and compressed to two months form commencement to substantial completion.